Intergrated Technology Projects Worldwide

 

+44 (0)1406 426125

Previous

Qatar SCADA solution

Following a request from a Qatar based Power generation facility, Centralinc provided a turn key SCADA solution.

Each of the sites were dotted around a wide area, and would have required a large, expensive and hard to install fibre optic network system.

Centralinc designed and manufactured panels, allowing wireless bridging devices to be set up in a daisy chained mode, passing the various signals to and from each of the sites, back to the main control room.

Centralinc also designed the PC based SCADA system for the client.

All parts were supplied by Centralinc for this project, with every device being sent over, pre-programmed, and ready to plug and play on site.  This included the provision for remote access to the system from anywhere in the world, via a cellular remote connectivity device.