Intergrated Technology Projects Worldwide

 

+44 (0)1406 426125

Previous

Brazil PLC system commissioning

Centralinc systems were asked to go to Macapa Brazil to commission a PLC load management system on a temporary power installation.

The system allowed the site to automatically control a number of power generators from one central location.

Training was also given to local staff on the operation and maintenance of the system, and a remote connectivity facility added for future fault finding support.