Intergrated Technology Projects Worldwide

 

+44 (0)1406 426125

Previous

UK PLC power generation application

Go back to:

PROJECTS

Following a request from a UK based power generation company, Centralinc provided a PLC control system capable of automating the operation of 2 separate power generation facilities from one central location.

The second site was around 500 meters away, so to link the sites a wireless ghost bridge was utilised, saving on expensive fibre optic cabling, and speeding up the installation and commissioning of the system.